page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42 page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
< prev - next > Energy Mechanical Power tech_guidelines_gravity_goods_ropeway (Printable PDF)
GRAVITY GOODS ROPEWAY
7.4 Construction of Gabion Wall
Gabion walls are usually provided for slope
protection at upper and bottom stations. The
standard slope of the gabions should be in the
ratio of at least 1:2 in horizontal. The gabion
should be filled from strong and solid rock laid
very closely and packed without gaps to maximise
the weight. The gabions should be firmly anchored
into the ground by founding the gabions below the
expected scour depth and should be tied together
to give a monolithic finish.
7.5 Mixing, Placing and Curing Concrete
7.5.1 Placing steel reinforcement
Following points should be kept in mind while
placing the reinforcement:
Steel will bond well with concrete only if it
is clean and free of grease and scaling rust.
The reinforcement should be cleaned using
wire brush to remove any scaling rust.
Ensure the minimum lap length, as
recommend by the IS code. The minimum
lap length ensures that the steel bars join
and perform as continuous bars in load
transmission.
The steel reinforcement bars should be
tied as shown in the working drawings. The
reinforcements should be tied and placed
by a qualified or experienced person. The
site in charge should inspect the quality
of all the steel fixings before the concrete
is placed.
The vertical reinforcement should
be provided with L shaped toes on
construction joints to ensure the stability
of the steel cage during the pouring of
the concrete and also to ensure proper
anchorage of the steel in the concrete.
Specifications
Reinforcement steel should comply with the
following IS codes:
IS 1786-1986
High strength deformed
steel bars for concrete
reinforcement
IS 456-1978
Plain and reinforced
concrete
Steel grade, Fe 415, High yield strength
Deformed Bars.
7.5.2 Concrete constituents
Concrete is composed of four constituents: cement,
sand, aggregate and water. The cement creates
adhesion between the concrete components as
well as fills the voids between them. The aggregate
forms the main body of the concrete, whilst water
acts as a catalyst and allows the mix to be worked.
The aggregate and cement together provides the
concrete strength.
Cement
Cement must meet requirement of the Nepal
standard (NS). The commonly used cement is
Portland cement of grade 55. It should neither
be exposed to moisture nor be stored for a lengthy
period to keep the strength of the cement intact.
Aggregates
The aggregate made of parent rock quality is
suitable for concrete but it should be approved
by the site engineer. The aggregates from rock
like mica, sandstone, marl, conglomerates,
34